Subject: Re: Watching Speech now

The DC's put out a perpetual noise that is loud enough to be a problem.

Even without an on-site gas turbine power plant, I'm sure there is a lot of noise from the cooling system needed to dissipate the heat generated by the electronics.

I would not trust anything coming out of the Trump admin as far as
forcing the DC's to generate their own power. 1 well placed
"contribution" to some Trump coins would surely end that requirement.


Lessee who the "contributors" could be:

A number of utility companies, who would sell a lot more power, but also would need to invest in central power plants, and a much stronger grid, to deliver the power.

A number of data center companies, who don't want the extra expense of building their own power plants.

GE Venova, which, under Trump's decree, would sell flox of on-site plants to the data center operators, instead of a few, much larger, central power plants to utility companies.

Ding, ding, ding: the "contributor" is GEV. GEV shares have more than tripled over the past year. I'm pretty sure GEV's bean counters have figured out that mass producing small, data center sized plants, will deliver more profits, faster, than a few large, central, plants.

Steve